Attention A T users. To access the menus on this page please perform the following steps. 1. Please switch auto forms mode to off. 2. Hit enter to expand a main menu option (Health, Benefits, etc). 3. To enter and activate the submenu links, hit the down arrow. You will now be able to tab or arrow up or down through the submenu options to access/activate the submenu links.
Attention A T users. To access the combo box on this page please perform the following steps. 1. Press the alt key and then the down arrow. 2. Use the up and down arrows to navigate this combo box. 3. Press enter on the item you wish to view. This will take you to the page listed.
Menu
Menu
Veterans Crisis Line Badge
My healthevet badge

Office of Construction & Facilities Management

 

Design & Construction Procedures (PG-18-3)


Design and Construction Procedures

  • Table of Contents
  • Foreword
  • Topic 01 Codes, Standards, and Executive Orders
  • Topic 02 Drawings
  • Topic 03 VA Hospital Building System
  • Topic 05 Pipe Basements
  • Topic 06 Floor Slab Depressions
  • Topic 07 Piping and Ducts
  • Topic 08 Electrical Rooms and Closets
  • Topic 09 Energy Center
  • Topic 10 Computer Systems (Rescinded)
  • Topic 11 Noise Transmission Control
  • Topic 12 Future Vertical Expansion
  • Topic 13 Service Life and Replacement Cycles
  • Topic 14 Security
  • Topic 17 Physical Security and Resiliency
  • Topic 18 Transportation, Materials and Solid Waste Management, and Automated Delivery Systems