Attention A T users. To access the menus on this page please perform the following steps.
1. Please switch auto forms mode to off.
2. Hit enter to expand a main menu option (Health, Benefits, etc).
3. To enter and activate the submenu links, hit the down arrow.
You will now be able to tab or arrow up or down through the submenu options to access/activate the submenu links.
Locator
Contact
Search
VA »
Office of Construction & Facilities Management
»
Technical Information Library »
Design Criteria »
NCA Design & Construction Criteria »
NCA MASTER CONSTRUCTION SPECIFICATIONS
Office of Construction & Facilities Management
NCA MASTER CONSTRUCTION SPECIFICATIONS
TIL Feedback - we welcome your suggestions at til@va.gov
This set of Master Construction Specifications has been specifically edited for use on VA National Cemetery Administration (NCA) construction projects.
- Division 0 Special Sections
- Division 1 General Requirements
- Division 2 Existing Conditions
- Division 3 Concrete
- Division 4 Masonry
- Division 5 Metals
- Division 6 Wood and Plastic
- Division 7 Thermal and Moisture Protection
- Division 8 Doors and Windows
- Division 9 Finishes
- Division 10 Specialties
- Division 11 Equipment
- Division 12 Furnishings
- Division 13 Special Construction
- Division 22 Plumbing
- Division 23 Heat, Ventilating, and Air Conditioning
- Division 25 Integrated Automation
- Division 26 Electrical
- Division 27 Communications
- Division 28 Electronic Safety and Security
- Division 31 Earthwork
- Division 32 Exterior Improvements
- Division 33 Utilities
All documents are in Microsoft Word unless otherwise indicated. All specification sections have dual Metric/English units.
Number | Title | Change Summary |
---|---|---|
00 01 10 | Table of Contents | |
00 01 15 | List of Drawing Sheets |
Number | Title | Change Summary |
---|---|---|
01 00 01 | General Requirements (Major NCA Projects) | 2023-10 |
01 00 02 | General Requirements (Minor NCA Projects) | 2023-10 |
01 32 16.13 | Network Analysis Schedules | 2023-10 |
01 32 17 | Network Analysis Schedules (Microsoft Project Gantt Chart) | 2023-10 |
01 33 23 | Shop Drawings, Product Data, and Samples | 2023-10 |
01 42 19 | Reference Standards | 2023-10 |
01 45 29 | Testing Laboratory Services | 2023-10 |
01 57 19 | Temporary Environmental Controls | 2023-10 |
01 74 19 | Construction Waste Management | 2023-10 |
01 81 13 | Sustainable Construction Requirements | 2023-10 |
01 81 13.11 | Sustainability Certification Requirements - LEED v4.1 BD+C: New Construction and Major Renovation | 2023-04 |
01 91 00 | General Commissioning Requirements | 2023-10 |
Number | Title | Change Summary |
---|---|---|
02 21 00 | Site Surveys | 2023-10 |
02 41 00 | Demolition and Site Clearing | 2023-10 |
02 83 33.13 | Lead-Based Paint Removal and Disposal | 2023-10 |
Number | Title | Change Summary |
---|---|---|
03 30 53 | (Short Form) Cast-in-Place Concrete | 2023-10 |
03 41 33 | Precast Pretensioned Concrete | 2023-10 |
03 48 21 | Precast Concrete Burial Crypt (Double Depth Lawn Crypt) | 2023-10 |
03 48 24 | Precast Concrete Columbarium Units | 2023-10 |
03 48 26 | Precast Concrete Memorial Wall Units | 2023-10 |
03 52 00 | Lightweight Concrete Roof Insulation | 2023-10 |
Number | Title | Change Summary |
---|---|---|
04 05 13 | Masonry Mortaring | 2023-10 |
04 05 16 | Masonry Grouting | 2023-10 |
04 05 31 | Masonry Tuck Pointing | 2023-10 |
04 20 00 | Unit Masonry | 2023-10 |
04 43 00 | Natural Stone Veneer | 2023-10 |
04 72 00 | Cast Stone Masonry | 2023-10 |
04 73 00 | Columbarium Niche Covers | 2023-10 |
04 73 10 | Memorial Wall Markers | 2023-10 |
Number | Title | Change Summary |
---|---|---|
05 12 00 | Structural Steel Framing | 2023-10 |
05 21 00 | Steel Joist Framing | 2023-10 |
05 31 00 | Steel Decking | 2023-10 |
05 36 00 | Composite Metal Decking | 2023-10 |
05 40 00 | Cold-Formed Metal Framing | 2023-10 |
05 50 00 | Metal Fabrications | 2023-10 |
05 51 00 | Metal Stairs | 2023-10 |
Number | Title | Change Summary |
---|---|---|
06 10 00 | Rough Carpentry | 2023-10 |
06 20 00 | Finish Carpentry | 2023-10 |
Number | Title | Change Summary |
---|---|---|
07 08 00 | Facility Exterior Closure Commissioning | 2023-10 |
07 11 13 | Bituminous Dampproofing | 2023-10 |
07 12 00 | Built-Up Bituminous Waterproofing | 2023-10 |
07 13 00 | Sheet Waterproofing | 2023-10 |
07 13 52 | Modified Bituminous Sheet Waterproofing | 2023-10 |
07 21 13 | Thermal Insulation | 2023-10 |
07 21 23 | Loose-Fill Insulation | 2023-10 |
07 22 00 | Roof and Deck Insulation | 2023-10 |
07 24 00 | Exterior Insulation and Finish Systems | 2023-10 |
07 31 13 | Asphalt Shingles | 2023-10 |
07 31 26 | Slate Shingles | 2023-10 |
07 31 29.13 | Wood Shingles | 2023-10 |
07 32 13 | Clay Roof Tiles | 2023-10 |
07 40 00 | Roofing and Siding Panels | 2023-10 |
07 41 13 | Standing Seam Metal Roofing | 2023-10 |
07 51 00 | Built-Up Bituminous Roofing | 2023-10 |
07 52 16 | SBS Modified Bituminous Membrane Roofing | 2023-10 |
07 53 23 | EPDM Roofing | 2023-10 |
07 54 19 | Polyvinyl-Chloride Roofing | 2023-10 |
07 60 00 | Flashing and Sheet Metal | 2023-10 |
07 61 16 | Copper Standing Seam Roofing | 2023-10 |
07 71 00 | Roof Specialties | 2023-10 |
07 72 00 | Roof Accessories | 2023-10 |
07 81 00 | Applied Fireproofing | 2023-10 |
07 84 00 | Firestopping | 2023-10 |
07 92 00 | Joint Sealants | 2023-10 |
Number | Title | Change Summary |
---|---|---|
08 11 13 | Hollow Metal Doors and Frames | 2023-10 |
08 14 00 | Interior Wood Doors | 2023-10 |
08 31 13 | Access Doors and Frames | 2023-10 |
08 33 00 | Coiling Doors and Grilles | 2023-10 |
08 36 13 | Sectional Doors | 2023-10 |
08 41 13 | Aluminum-Framed Entrances and Storefronts | 2023-10 |
08 51 13 | Aluminum Windows | 2023-10 |
08 51 23 | Steel Windows | 2023-10 |
08 51 69.11 | Aluminum Storm Windows | 2023-10 |
08 63 00 | Metal-Framed Skylights | 2023-10 |
08 71 00 | Door Hardware | 2023-10 |
08 71 13.11 | Low Energy Power Assist Door Operators | 2023-10 |
08 80 00 | Glazing | 2023-10 |
08 90 00 | Louvers and Vents | 2023-10 |
Number | Title | Change Summary |
---|---|---|
09 06 00 | Schedule for Finishes | 2023-10 |
09 22 16 | Non-Structural Metal Framing | 2023-10 |
09 24 00 | Portland Cement Plastering | 2023-10 |
09 29 00 | Gypsum Board | 2023-10 |
09 30 13 | Tiling | 2023-10 |
09 51 00 | Acoustical Ceilings | 2023-10 |
09 63 13 | Brick Flooring | 2023-10 |
09 63 40 | Stone Flooring | 2023-10 |
09 65 13 | Resilient Base and Accessories | 2023-10 |
09 65 16 | Resilient Sheet Flooring | 2023-10 |
09 65 19 | Resilient Tile Flooring | 2023-10 |
09 66 13 | Portland Cement Terrazzo Flooring | 2023-10 |
09 66 16 | Terrazzo Floor Tile | 2023-10 |
09 67 00 | Fluid-Applied Flooring | 2023-10 |
09 67 23 | Resinous Flooring | 2023-10 |
09 68 00 | Carpeting | 2023-10 |
09 91 00 | Painting | 2023-10 |
Number | Title | Change Summary |
---|---|---|
10 11 13 | Markerboards | 2023-10 |
10 11 23 | Tackboards | 2023-10 |
10 14 00 | Exterior Signage | 2023-10 |
10 14 05 | Interior Signage | 2023-10 |
10 21 13 | Toilet Compartments | 2023-10 |
10 28 00 | Toilet and Bath Accessories | 2023-10 |
10 44 13 | Fire Extinguisher Cabinets | 2023-10 |
10 51 13 | Metal Lockers | 2023-10 |
10 56 13 | Steel Shelving | 2023-10 |
10 75 00 | Flagpoles | 2023-10 |
Number | Title | Change Summary |
---|---|---|
11 11 14 | Motor Vehible Lifts | 2023-10 |
11 11 16 | Vehicle Service Equipment | 2023-10 |
11 11 26 | Vehicle Washing Equipment | 2023-10 |
11 83 00 | Global Navigation Satellite System (GNSS) Reference System | 2023-10 |
11 83 02 | Geodata | 2023-10 |
Number | Title | Change Summary |
---|---|---|
12 24 00 | Window Shades | 2023-10 |
12 32 00 | Manufactured Wood Casework | 2023-10 |
12 48 13 | Entrance Floor Mats | 2023-10 |
Number | Title | Change Summary |
---|---|---|
13 34 19 | Metal Building Systems | 2023-10 |
Number | Title | Change Summary |
---|---|---|
22 05 11 | Common Work Results for Plumbing | 2016-11 |
22 05 12 | General Motor Requirements for Plumbing Equipment | 2016-11 |
22 05 19 | Meters and Gages for Plumbing Piping | 2016-11 |
22 05 23 | General-Duty Valves for Plumbing Piping | 2016-11 |
22 05 33 | Heat Tracing for Plumbing Piping | 2016-11 |
22 08 00 | Commissioning of Plumbing Systems | 2015-12 |
22 11 00 | Facility Water Distribution | 2016-11 |
22 11 23 | Domestic Water Pumps | 2016-11 |
22 12 16 | Facility Elevated, Potable-Water Storage Tanks | 2016-11 |
22 13 00 | Facility Sanitary Sewerage | 2016-11 |
22 13 23 | Sanitary Waste Interceptors | 2016-11 |
22 13 29 | Sanitary Sewerage Pumps | 2016-11 |
22 13 33 | Packaged, Submersible Sewerage Pump Units | 2016-11 |
22 14 00 | Facility Storm Drainage | 2016-11 |
22 14 29 | Sump Pumps | 2016-11 |
22 14 33 | Packaged, Pedestal Drainage Pump Units | 2016-11 |
22 14 36 | Packaged, Submersible, Drainage Pump Units | 2016-11 |
22 15 00 | General Service Compressed-Air Systems | 2016-11 |
22 31 11 | Water Softeners | 2016-11 |
22 33 00 | Electric Domestic Water Heaters | 2016-11 |
22 34 00 | Fuel-Fired Domestic Water Heaters | 2016-11 |
22 40 00 | Plumbing Fixtures | 2016-11 |
Number | Title | Change Summary |
---|---|---|
23 05 11 | Common Work Results for HVAC | 2016-11 |
23 05 12 | General Motor Requirements for HVAC Equipment | 2016-11 |
23 05 41 | Noise and Vibration Control for HVAC Piping and Equipment | 2016-11 |
23 05 93 | Testing, Adjusting, and Balancing for HVAC | 2016-11 |
23 07 11 | HVAC Insulation | 2016-11 |
23 08 00 | Commissioning of HVAC Systems | 2015-12 |
23 09 23 | Direct-Digital Control System for HVAC | 2016-11 |
23 11 23 | Facility Natural-Gas Piping | 2016-11 |
23 13 23 | Concrete Above Ground Fuel Storage | |
23 21 13 | Hydronic Piping | 2016-11 |
23 21 14 | Ground Loop Heat Pump Piping | 2016-11 |
23 21 23 | Hydronic Pumps | |
23 23 00 | Refrigerant Piping | 2016-11 |
23 25 00 | HVAC Water Treatment | |
23 31 00 | HVAC Ducts and Casings | 2016-11 |
23 34 00 | HVAC Fans | 2016-11 |
23 36 00 | Air Terminal Units | 2016-11 |
23 37 00 | Air Outlets and Inlets | 2016-11 |
23 40 00 | HVAC Air Cleaning Devices | 2016-11 |
23 55 23 | Gas-Fired Radiant Heaters | 2016-11 |
23 55 33 | Fuel-Fired Unit Heaters | 2016-11 |
23 64 00 | Packaged Water Chillers | |
23 81 00 | Decentralized Unitary HVAC Equipment | 2016-11 |
23 81 43 | Air-Source Unitary Heat Pumps | 2016-11 |
23 81 46 | Water-Source Unitary Heat Pumps | 2016-11 |
23 82 16 | Air Coils | 2016-11 |
23 82 33 | Convectors | 2016-11 |
23 82 39 | Unit Heaters | 2016-11 |
23 83 23 | Radiant-Heating Electric Panels | 2016-11 |
Number | Title | Change Summary |
---|---|---|
25 10 10 | Advanced Utility Metering System | 2016-11 |
Number | Title | Change Summary |
---|---|---|
26 05 11 | Requirements for Electrical Installations | 2023-04 |
26 05 19 | Low-Voltage Electrical Power Conductors and Cables | 2023-04 |
26 05 26 | Grounding and Bonding for Electrical Systems | 2023-04 |
26 05 33 | Raceway and Boxes for Electrical Systems | 2023-04 |
26 05 41 | Underground Electrical Construction | 2023-04 |
26 05 73 | Overcurrent Protective Device Coordination Study | 2023-04 |
26 08 00 | Commissioning of Electrical Systems | 2023-04 |
26 22 00 | Low-Voltage Transformers | 2023-04 |
26 24 13 | Distribution Switchboards | 2023-04 |
26 24 16 | Panelboards | 2023-04 |
26 27 26 | Wiring Devices | 2023-04 |
26 29 11 | Motor Controllers | 2023-04 |
26 29 21 | Enclosed Switches and Circuit Breakers | 2023-04 |
26 30 05 | Solar Energy Electrical Power Generation System | 2023-04 |
26 32 13 | Engine Generators | 2023-04 |
26 36 23 | Automatic Transfer Switches | 2023-04 |
26 41 00 | Facility Lightning Protection | 2023-04 |
26 51 00 | Interior Lighting | 2023-04 |
26 56 00 | Exterior Lighting | 2023-04 |
Number | Title | Change Summary |
---|---|---|
28 08 00 | Commissioning of Electronic Safety and Security Systems | 2015-12 |
28 10 00 | Access Control | 2018-03 |
28 20 00 | Video Surveillance | 2018-03 |
28 31 00 | Intrusion Detection | 2018-03 |
28 46 00 | Fire Detection and Alarm | 2016-11 |
Number | Title | Change Summary |
---|---|---|
31 20 00 | Earth Moving | 2016-11 |
31 20 11 | Earth Moving (Short Form) | 2016-11 |
31 23 19 | Dewatering | 2016-11 |
31 23 23.33 | Flowable Fill | 2016-11 |
31 32 23 | Pressure Grouting Soil Stabilization | 2016-11 |
31 62 00 | Driven Piles | 2016-11 |
31 63 16 | Auger Cast Grout Piles | 2016-11 |
31 63 26 | Drilled Caissons | 2016-11 |
Number | Title | Change Summary |
---|---|---|
32 05 23 | Cement and Concrete for Exterior Improvements | 2016-11 |
32 08 00 | Commissioning of Planting Irrigation Systems | 2015-12 |
32 12 16 | Asphalt Paving | 2016-11 |
32 14 16 | Brick Unit Paving | 2016-11 |
32 17 23 | Pavement Markings | 2016-11 |
32 31 13 | Chain Link Fences and Gates | 2016-11 |
32 31 19 | Decorative Metal Fences and Gates | 2016-11 |
32 33 00 | Site Furnishings | 2017-01 |
32 84 00 | Planting Irrigation | 2017-01 |
32 90 00 | Planting | 2016-11 |
Number | Title | Change Summary |
---|---|---|
33 08 00 | Commissioning of Site Utility Systems | 2015-12 |
33 10 00 | Water Utilities | 2016-11 |
33 30 00 | Sanitary Sewerage Utilities | 2016-11 |
33 40 00 | Storm Sewerage Utilities | 2016-11 |
33 41 13 | Foundation Drainage | 2017-01 |
33 51 00 | Natural-Gas Distribution | 2016-11 |