Attention A T users. To access the menus on this page please perform the following steps.
1. Please switch auto forms mode to off.
2. Hit enter to expand a main menu option (Health, Benefits, etc).
3. To enter and activate the submenu links, hit the down arrow.
You will now be able to tab or arrow up or down through the submenu options to access/activate the submenu links.
Locator
Contact
Search
VA »
Office of Construction & Facilities Management
»
Technical Information Library »
Design Criteria »
Miscellaneous Criteria
Office of Construction & Facilities Management
Miscellaneous Criteria
TIL Feedback - we welcome your suggestions at til@va.gov
- Asbestos
- Commissioning Process
- Fire & Safety
- Harm Prevention
- Healing Environments
- Innovative 21st Century Building Environments for VA Healthcare Delivery
- Metric
- Physical Security & Resiliency
- Retro-Commissioning Process
- Room Finishes
- Signage and Wayfinding
- Telecom Systems Infrastructure Standards and Design
- Tuberculosis Facility Guidance
- VA Hospital Building System Development Study
Asbestos
- Asbestos Abatement Specifications
- Asbestos Abatement Design Manual
- VA Asbestos Directives and Handbook
Commissioning Process
- Whole Building Commissioning Process Manual Summary of Changes
- compressed file with Cx Manual and Appendix templates in Word and Excel
Also see Retro Commissioning Process
and Natl Cemetery Admin Commissioning Process
Fire & Safety
- Advisory Committee on Structural Safety of VA Facilities
- Fire Protection Design Manual
- Qualifications and Scope of Services for Project Fire Protection Engineer
- Construction Projects Fire Code Compliance Process
- A/E Design Submission Requirements/Instructions
- Specifications:
- A/E Review Checklists
- Design Manuals
Harm Prevention
- Architectural Design Manual - Section 4.33
- Parking Design Manual - Section 7-6
- Mental Health Design Guide
Healing Environments
Metric
- VA Directive 0100 Metric Transition Plan Implementation and Guidance
- VA Handbook 0100 Metric Transition Plan (Implementation Procedures)
- Metric Guide for Federal Construction
- M2, Metric Design Guide
- Newsletters
Physical Security and Resiliency
(moved)
Plaques and Seals
(moved)
Retro-Commissioning Process
Room Finishes
- PG 18-14 Room Finishes, Door, and Hardware Schedule
Signage and Wayfinding
(moved)
Telecom Systems Infrastructure Standards and Design
(moved)
Tuberculosis Facility Guidance