Attention A T users. To access the menus on this page please perform the following steps. 1. Please switch auto forms mode to off. 2. Hit enter to expand a main menu option (Health, Benefits, etc). 3. To enter and activate the submenu links, hit the down arrow. You will now be able to tab or arrow up or down through the submenu options to access/activate the submenu links.
Attention A T users. To access the combo box on this page please perform the following steps. 1. Press the alt key and then the down arrow. 2. Use the up and down arrows to navigate this combo box. 3. Press enter on the item you wish to view. This will take you to the page listed.
Menu
Menu
Veterans Crisis Line Badge
My healthevet badge

Office of Construction & Facilities Management

 

Interim Telecommunications Master Specifications

 

Technical Information Library (TIL) - The source for VA's electronic Design and Construction Information

TIL Feedback - we welcome your suggestions at til@va.gov

This set of interim master guide specifications must be used for the interior telecommunications backbone and horizontal distribution extending from the entrance room, through the main computer room and telecommunications rooms, to the telecommunications wall outlets. The scope of application includes floor-mounted racks and cabinets in the main computer room and telecommunications rooms, rack and cabinet power and backup power equipment, cabling, and assemblies supporting the power and data cabling.

For other telecommunications systems and equipment, continue to refer to the specifications published on the main PG-18-1 page. Where other systems interface with systems addressed in the interim specifications, such as grounding and bonding, professional judgement is required to ensure safe and operable design and construction.

Coordination and amendment of specification numbers, titles, and content between the two series is required to produce a single coordinated set of construction specifications.

This interim publication is necessary to better communicate and promulgate the design intent and implementation of the Infrastructure Standard for Telecommunications Spaces, while VA continues to evaluate and integrate the interim specifications into the PG-18-1 Master Specifications.

Published 11/25/2022, effective 12/01/2022.

All interim Telecommunications specifications are in Microsoft Word.  Download all interim Telecommunications sections in compressed file.

Division 00 - Special Sections
Number Title
00 01 10 Table of Contents
Division 27 - Communications
Number Title
27 05 26 Grounding and Bonding for Communications Systems
27 05 33 Conduits and Backboxes for Communications Systems
27 05 36 Cable Trays for Communications Systems
27 05 53 Identification for Communications Systems
27 10 00 Structured Cabling
27 11 16 Communications Cabinets, Racks, Frames, and Enclosures
27 11 19 Communications Termination Blocks and Patch Panels
27 11 26 Communications Rack Mounted Power Protection and Power Strips
27 13 13 Communications Copper Backbone Cabling
27 13 13.13 Communications Copper Cable Splicing and Terminations
27 13 23 Communications Optical Fiber Backbone Cabling
27 13 23.13 Communications Optical Fiber Splicing and Terminations
27 15 13 Communications Copper Horizontal Cabling
27 16 19 Communications Patch Cords, Station Cords, and Cross-Connect Wire